The hull is moulded in one continuous operation and delivered complete to the site. No joints, no sealant lines and no ground works. The water surface can be divided into separate basins, each at its own temperature — and the whole facility can be moved if the harbour changes around it twenty years from now.
The principle
The pool is built like a vessel. Glass fibre and core material are laid up dry in a mould, the entire structure is vacuum-infused with resin in one continuous process, and it cures as a single piece. There are no cold joints to seal, no sealant lines to age and no tiles to come loose.
The sandwich construction makes the hull load-bearing and insulating at the same time. The core holds the heat in the water, and the low self-weight is what lets the facility float with good margin and be towed.
Because the structure is carried by the water, you avoid foundations, blasting, mass replacement and groundwater problems. That is the single line item most likely to overrun on a land-based project.
Configuration
The standard pool is 25 × 12.5 metres, but other dimensions can be made to order. The water surface can also be divided into separate basins.
Full-length, full-depth lanes for the swimming club, lap swimmers and lifesaving tests. Cooler water gives better conditions for hard training.
A shallower basin with warmer water, where children can stand safely and instructors can stay in the water for a full session without getting cold.
A separate warm basin for rehabilitation, movement groups and baby swimming — user groups that rarely get pool time in a conventional public facility.
The service building
Changing rooms, showers, plant room and administration can go in a building on shore where you already have space. If you do not, the entire service building can be delivered on its own float as part of the package.
That means a complete facility can be established without taking up a single square metre of land. In port cities where waterfront area is the scarcest resource the authority has, this is often what decides whether the project is feasible at all.
Temperatures are typical operating values and are adapted to each facility.
Heating
Every floating facility is delivered with an integrated sea-water heat plant. The heat source sits directly beneath the hull — no boreholes, no ground collector loop and no plot set aside for a heating plant. The figure below is calculated at a sea temperature of 2 °C, that is, midwinter. The rest of the year the ratio is better.
Coefficient of performance
at 2 °C sea water
With a coefficient of performance around 4.5, heating is covered by roughly a fifth of the electricity a direct-electric installation would draw. That is what makes heated outdoor operation viable to budget for, not merely technically possible.
A pool has to hold 28–34 degrees, not the 55 of a radiator circuit or a domestic hot water tank. The lift the heat pump has to make is therefore small, and the coefficient stays high even when the sea is at its coldest. Pool heating is close to the ideal application for a heat pump.
A land-based heat pump installation needs boreholes or collector area, with ground investigations and excavation. A floating facility already sits in its heat source. Move the facility and the heat plant moves with it.
The plant supplies the water treatment system in each basin, so training, teaching and therapy basins can hold different temperatures at the same time without a separate heating installation for each.
Example value at 2 °C sea temperature and normal supply temperature for pools. The value for a specific facility is calculated in the pre-project.
Suitability
The solution requires sheltered water of sufficient depth. Where that condition is met, it is almost always cheaper than building on land.
Sheltered water in the middle of town, usually with infrastructure and access already in place. The most common and the simplest location.
Requires assessment of wave exposure and ice conditions, but opens up facilities in municipalities with no suitable building site.
Where rock, quick clay or a high water table makes building on land expensive, the arithmetic turns quickly.
Because the facility travels as deck cargo and is only launched at the nearest port, distance from Arendal has little practical significance. Northern Norway and destinations abroad are as accessible as the neighbouring municipality.
A facility with people in the water draws life to the water's edge all day. For a developer that is an anchor attraction that lifts the whole area, not just a technical installation.
If an existing pool hall is to be refurbished, a floating facility can cover the need in the meantime — and be moved on afterwards.
From decision to opening
Prerequisites
The list is short, and we go through every point in the pre-project. In our experience the agreement covering the water area takes the longest — start there. If you choose the service building on a float, the requirement for a building site disappears entirely.
Reference
Arendal Sjøbad was built as a public research and development contract, with the municipal port authority Arendal Havn KF as client, designer and contractor. Its project manager and its designer work here today, and CSUB, which engineered and fabricated the pool, is our fabrication partner. We are happy to show the structure, the water quality and the operation to anyone interested.